Agriculture:- Model Bankable Projects in India | Minor Irrigation : Tubewells Part 3 --- www.nabard.org
ANNEXURE – I
Check List
Minor Irrigation
Groundwater Development Schemes
(To be completed by Bank Officer forwarding the Scheme)
Tick ( P ) in boxes to signify that the relevant information has been furnished under the Scheme.
|
|
1.
|
Name of Scheme
|
2.
|
Scheme Location
|
3.
|
Area Map
|
4.
|
Area-geographical area, cultivated area and area irrigated by different sources
|
5.
|
Soil conditions, cropping pattern and crop water requirement
|
6.
|
IMD Normal Rainfall
|
7.
|
Geological Formations
|
8.
|
Length of canal and distributaries with wetted perimeter and number of running days in the scheme area
|
9.
|
Groundwater availability – groundwater recharge and draft, stage of groundwater development and category of block
|
10.
|
Yearwise physical programme and financial outlay
|
11.
|
Spacing between different type of minor irrigation works
|
12.
|
Chemical quality of groundwater
|
13.
|
Design of minor irrigation works
|
14.
|
Specifications of pumping machinery, diameter of suction and delivery pipes, discharge, total head and HP of pumpset
|
15.
|
Cost Estimates
|
16.
|
Financial returns on investments with reference to representative size of holdings in different climatic zones in the scheme area
|
17.
|
Lending terms i.e. interest rate, down payment, repayment period, extent of subsidy, if available
|
18.
|
Availability and arrangement for procurement and distribution of material
|
19.
|
Agency providing crop loan and its adequacy
|
20.
|
Supervision and monitoring arrangements
|
21.
|
Technical guidance if available and by whom
|
22.
|
Availability of extension services
|
23.
|
Availability of power and diesel
|
24.
|
Availability of seeds, fertilizers and pesticides
|
|
|
Annexure – II
Cropping Pattern and Water Requirements
(1 ha Farm Model)
Working Period : 6 hrs/day
|
|
Season
|
Crop
|
Area
(ha)
|
Irrigation Interval (days)
|
Depth of Irrigation (cm)
|
Kharif
|
Paddy
|
0.75
|
20
|
5
|
|
Maize
|
0.25
|
24
|
5
|
|
|
|
|
|
Rabi
|
Wheat
|
0.50
|
15
|
7.5
|
|
Gram
|
0.25
|
15
|
7.5
|
|
Potato
|
0.25
|
10
|
5
|
|
|
A x I Discharge Required (Q) = 28 ------- R x t
Where Q = Discharge in lps A = Area in ha l = Depth of Irrigation in cm R = Irrigation Interval in days t = Hours of operation of well per day
Kharif
0.75 x 5 0.25 x 5 Q = 28 ( -------- + ---------- ) 20 x 6 24 x 6
= 1.12 lps
Rabi
0.50 x 7.5 0.25 x 7.5 0.25 x 5 Q = 28 (----------- + ------------ + ------------ ) 15 x 6 15 x 6 10 x 6
= 2.33 lps say 2.5 lps
Thus the peak discharge required is during Rabi and is estimated at 2.5 lps which should be available from the shallow tubewell.
|
|
Annexure - III PRE AND POST DEVELOPMENT CROPPING PATTERN AND INCOME |
No comments:
Post a Comment